共检索到 3

Introduction: More than 16% of the total electricity used worldwide is met by hydropower, having local to regional environmental consequences. With positive indicators that energy is becoming more broadly available and sustainable, the world is moving closer to achieving Sustainable Development Goal 7 (SDG 7). Pakistan became the first nation to include the Sustainable Development Goals (SDGs) in its national development strategy.Methodology: The current study sought to investigate the structural limits of Environmental Impact Assessment (EIA) guidelines for hydropower development in Pakistan. The study included the document review of the EIA reports about hydropower projects in Pakistan, scientific questionnaires from decision-makers, and public consultation.Results and Discussion: The document evaluates that an adequate mechanism is available, and donors like the Asian Development Bank and World Bank observe the implementation process of EIA in Pakistan. However, a comprehensive analysis of the EIA system found several things that could be improved, not only in the institutional framework but also in actual implementation and practices. More than 20% of respondent decision-makers disagreed with the compliance of the current Institutional Framework with EIA guidelines, and 25% think that the existing guidelines followed in Pakistan are not aligned with international standards and practices for Hydropower in actual practice. EIA has a limited impact on decision-making due to insufficient technical and financial resources.Recommendations: There should be a think tank with experts who can meet the needs of present and future epochs. The public should be communicated with and educated about EIA. For better efficiency, the officers and decision-makers should be trained internationally, i.e., the Water and Power Development Authority (WAPDA).

期刊论文 2024-01-18 DOI: http://dx.doi.org/10.3389/fenvs.2023.1342953

Environmental Impact Assessment (EIA) became mandatory in Pakistan in 1983 with the passage of the Pakistan Environmental Protection Ordinance. The Sustainable Development Goals were incorporated into Pakistan's national development strategy, making it the first country in history to do so. The study is based on evaluating the mitigation strategies and environmental impact assessment at the Gulpur Hydropower Project (HPP), Kotli, AJK, which uses the Poonch River's water resources to generate power and has a design capacity of 100 MW using the EIA documentation of Gulpur HPP. In addition to making additional observations and reviewing the literature, the study looked at Mira Power Limited's EIA reports. The possible effects, as well as the Government's and MPL's mitigating actions, were examined by the authors. EIA procedures at the Gulpur HPP considered several laws, including the Pakistan Environmental Protection Agency, AJK Wildlife Ordinance of 2013, the Land Acquisition Act of 1894, and Laws Regulating Flow Releases for Hydropower Projects. Projects using hydropower in delicate areas carry a high risk. Given the thorough analysis of the hazards in this instance, it is evident that the EIA had a significant impact on the project's design. The authors concluded that there are no negative environmental effects of the construction of hydropower projects in the concerned area and that all potential effects and compensation were handled legally and efficiently. The study suggested that all hydropower projects in Pakistan undertake environmental impact assessments. Evaluating the mitigation strategies and environmental impact assessment at the Gulpur Hydropower Project.EIA procedures at the Gulpur HPP considered several laws, including the Pakistan Environmental Protection Agency.The development of hydropower projects in the affected area had no negative environmental effects, and any potential effects or compensation were handled lawfully and effectively.

期刊论文 2023-07-01 DOI: http://dx.doi.org/10.1007/s42452-024-05786-5

The Himalayas have become synonymous with the hydropower developments for larger electricity demands of India's energy sector. In the Himachal Himalayas though, there are only three large storage dams with more than 1000 megawatts (hereafter MW) capacity that have very serious environmental issues. However, hundreds of small runoff-river hydropower plants across the Himachal Himalayas are a serious threat to the river regimes and Himalayan biota. There are 965 identified hydropower projects (hereafter HPPs) having a potential capacity of 27,436 MW in the Himachal Pradesh as of December 2019 as per the Directorate of Energy of the state. Out of the 965 identified, 216 are commissioned, including less than 5 MW plants, with an installed capacity of 10,596 MW, and were operational by December 2019. Only 58 projects are under construction among the identified with an installed capacity of 2351 MW, 640 projects are in various stages of clearance and investigation with an installed capacity 9260 MW, 30 projects are to be allotted with 1304 MW installed capacity, and merely four projects are disputed/cancelled with installed capacity of 50.50 MW. The large number of HPPs are sanctioned without proper consideration of negative environmental and geohazard impacts on the Himalayan terrestrial biota. In this work, our focus was on the hydropower and climate change impact on the Himalayan river regimes of the Chenab, the Ravi, the Beas, the Satluj, and the Yamuna river basins. We analyzed basin-wise rainfall, temperature, and soil moisture data from 1955 to 2019 to see the trend by applying the Mann-Kendall test, the linear regression model, and Sen's slope test. A basin-wise hazard zonation map has been drawn to assess the disaster vulnerability, and 12 hydropower sites have been covered through the primary survey for first-hand information of local perceptions and responses owing to hydropower plants.

期刊论文 2020-10-01 DOI: 10.3390/w12102739
  • 首页
  • 1
  • 末页
  • 跳转
当前展示1-3条  共3条,1页