In urban subway construction, shield tunneling near pile groups is common, where additional loads may threaten existing structures. This study establishes multiple 3D nonlinear FDM models with fluid-solid coupling to investigate how tunnel-pile clearances (Hc) affect the mechanical response of low-cap pile groups (2 x2) during side-by-side twin tunneling in composite strata. The advanced CYSoil model, incorporating nonlinearity, strain path dependency, and small strain behavior, is employed to simulate soil response. Results show that tunneling induces up to a similar to 66.7 % reduction in pore water pressure, forming a funnel-shaped seepage pattern. As Hc increases from 0.8D to 2.6D, the low-pressure zone shifts from sidewalls to vault and invert, while maximum displacements reduce by up to 14.04 mm (lateral), 5.28 mm (transverse), and 19.68 mm (vertical). Axial force evolution in piles follows a three-stage decline, i.e., rapid, slow, and moderate, with peak shaft resistance concentrated near the tunnel axis. These findings aid in optimizing tunnel-pile configurations and mitigating geotechnical risks.
This paper presents an experimental investigation into the interaction mechanism between aqueous foam and unsaturated granite residual soil during conditioning. Contact filter paper tests and undrained shear tests were used to analyze foam's effects on soil water retention and shear behavior, while surface tension tests, capillary rise tests, and microscopic observations examined the role of soil particles in foam stability. The findings demonstrate that foam-conditioned granite residual soils exhibit three distinct saturation- dependent phases (soil-only, transition, and soil-foam mixture) governed by foam's gas-liquid biphasic nature, with foam injection effectively reducing matric suction in unsaturated conditions. Increasing foam injection ratio reduces shear stress while enhancing pore water pressure, with vertical displacement transitioning from contractive to expansive behavior at low shearing rate. Effective cohesion stress varies with gravimetric water content via a rational function, while other effective cohesion stress and friction angles with respect to foam injection ratio, shearing rate, and gravimetric water content obey exponential relationships. The probability distribution function, cumulative distribution function, and decay pattern of bubbles in foam-only systems and soil-foam mixtures all exhibit exponential relationships with elapsed time. Furthermore, a new water-meniscus interaction model was established to characterize rupture and stabilization mechanisms of foam in unsaturated granite residual soils, with particular emphasis on capillary-dominated behavior. Saturation-dependent particle contact modes were identified for foam-conditioned unsaturated granite residual soils, offering valuable guidance for enhancing soil conditioning protocols in earth pressure balance shield tunneling operations.
Shield tunneling inevitably disturbs the surrounding soil, primarily resulting in changes in stress state, stress path, and strain. Modifications to certain parameters, such as shield thrust, shield friction, and soil loss, are made based on the elastic mechanics Mindlin solution and the mirror method, and a calculation expression for additional soil stresses induced by tunneling was derived. Additional soil stresses are calculated using the parameters of the Hangzhou Metro Kanji section. 3D principal stress paths and deviations of the principal stress axes near the tunnel crown, waist, and invert during shield tunneling were obtained by applying a transition matrix orthogonal transformation. These results are compared with experimental data to validate the theoretical solution's accuracy. The stress distribution along the tunneling direction and the 3D principal stress paths and deviations of the principal stress axes in the surrounding soil are determined. The results are as follows: The additional soil stresses along the tunneling direction follow a normal distribution and an S-shape. Under the combined influence of three construction mechanics factors, the shear stress component is approximately 1/3 to 1/2 of the normal stress and should not be neglected. During shield tunneling, the deviation angle of the principal stress axis at the tunnel crown changes from 90 degrees to 180 degrees, with little change in the magnitude of the principal stress. At the invert, the magnitude of the principal stress rapidly increases from 0.25 kPa to 8 kPa, with minimal deviation in the principal stress axis. At the shoulder, the principal stress variation and axis deviation are small. At the foot of the arch, the deviation angle of the major and minor principal stress axes is larger, while the magnitude of the principal stress slightly changes. At the waist, the deviation angle of the major principal stress is larger, and the magnitude of the minor principal stress significantly changes. A strategy for addressing changes in soil stress paths during shield tunnel construction is also proposed.
The shutdown of earth pressure balance (EPB) shield tunneling in gravel stratum can easily lead to significant unexpected ground deformation. In order to study the response of gravel strata during shield shutdown and the characteristic change of soil state in the chamber, this paper establishes a coupled Eulerian-Lagrangian finite element method (CEL-FEM) coupling analysis model that reflects the interaction between the spoiled soil and gravel strata. The plastic flow parameters of CEL spoiled soil are calibrated using the slump method, and a quantitative relationship between the slump value, plastic flow parameters, equivalent coefficient of loosening, and excavation face support pressure is established. The reliability and applicability of CEL method in the simulation of shield shutdown are verified by the field measurements. Results show that: (1) The chamber's soil equivalent loose coefficient is inversely proportional to the soil slump value which is related to soil's plastic flow parameters. (2) The shield shutdown in gravel strata has a more significant impact on the deep strata displacement than on the surface. (3) During the shield shutdown stage, the chamber pressure should be dynamically adjusted based on the soil deformation characteristics, and an increase of 16% could result in a stable rebalance.
The deformation caused by tunnel excavation is quite important for safety, especially when it is adjacent to the existing tunnel. Nevertheless, the investigation of deformation characteristics in overlapped curved shield tunneling remains inadequate. The analytical solution for calculating the deformation of the ground and existing tunnel induced by overlapped curved shield tunneling is derived by the Mirror theory, Mindlin solution and Euler-Bernoulli-Pasternak model, subsequently validated through both finite element simulation and field monitoring. It is determined that the overcutting plays a crucial role in the ground settlement resulting from curved shield tunneling compared to straight shield tunneling. The longitudinal settlement distribution can be categorized into five areas, with the area near the tunnel surface experiencing the most dramatic settlement changes. The deformation of the existing tunnel varies most significantly with turning radius compared to tunnel clearance and grouting pressure, especially when the turning radius is less than 30 times the tunnel diameter. The tunnel crown exhibits larger displacement than the tunnel bottom, resulting in a distinctive 'vertical egg' shape. Furthermore, an optimized overcutting mode is proposed, involving precise control of the extension speed and angular velocity of the overcutting cutter, which effectively mitigates ground deformation, ensuring the protection of the existing tunnel during the construction. (c) 2025 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/ 4.0/).
Excess pore water pressure (EPWP) induced by shield tunneling has a significant influence on the stability of the tunnel face, post-construction settlement, and the mechanical behavior of the tunnel lining. However, the three-dimensional and unsaturated property of the soil field is seldom considered in current research. Considering the non-uniform radial convergence model, a modified three-dimensional displacement solution induced by shield tunneling was established first. Then based on unsaturated EPWP elastic theory, a reliable and efficient method is developed to expedite the evaluation of EPWP distribution in three-dimensional saturated and unsaturated clay soil. The validity of the method is confirmed through comparison with field test and numerical outcomes. The analysis examples demonstrate that negative and positive EPWP are generated above the tunnel crown and beneath the tunnel invert, respectively. In the vertical direction, the negative EPWP exhibits a decreasing trend ahead of the heading face and an increasing trend behind it. Along the longitudinal direction, the influence zone of EPWP extends to 1D ahead of and 6D behind the heading face. With the decrease of soil saturation, the EPWP values tend to diminish. The maximum EPWP values observed in saturated conditions can be 16.13 times higher than those under unsaturated conditions.
In order to study the dynamic response of high-speed railway bridge and its deformation law under the coupling effect of vibration load and shield tunneling, a coupling model of shield tunneling and train load is established based on the actual case of tunneling under an adjacent bridge. The deformation characteristics and dynamic response of the bridge are investigated by analyzing the deformation under different tunneling conditions and train running speeds. The results show that the maximum disturbance of the original stress field around the bridge is caused when the shield penetrates to the near side of the bridge structure, at which time, the damping effect of the ground and bridge system on the vibration load is weakened, thus intensifying the dynamic response of the bridge system, and the additional deformation caused by the vibration load is the largest; the presence of train loads during the shield excavation slightly attenuates the differential settlement of the bridge, but increases the cumulative settlement of the bridge, in addition, the additional deformation of the bridge will increase with the increase of the train running speed; the additional deformation caused by the train load within 2m of the shield crossing on both sides of the bridge is large, so the construction should be avoided as much as possible when the train is running in this construction section.
An approach based on a Physics-Informed Neural Network (PINN) is introduced to tackle the two-dimensional (2D) rheological consolidation problem in the soil surrounding twin tunnels with different cross-sections, under exponentially time-growing drainage boundary. The rheological properties of the soil are modelled using a generalized viscoelastic Voigt model. An enhanced PINN-based solution is proposed to overcome the limitation of traditional PINNs in solving integral-differential equations (IDEs) equations. In particular, two key elements are introduced. First, a normalization method is employed for the spatio-temporal coordinates, to convert the IDEs governing the consolidation problem into conditions characterized by unit-duration time and unit-area geometric domain. Second, a conversion method for integral operators containing function derivatives is devised to further transform the IDEs into a set of second-order constant-coefficient homogeneous linear partial differential equations (PDEs). By using the TensorFlow framework, a series of PINN-based models is developed, incorporating the residual adaptive sampling method to address the 2D consolidation equations of soft soils surrounding tunnels with different burial depths and cross-sections. Comparative analyses between the PINNbased solutions, and either finite element or analytical solutions highlight that the aforementioned normalization stage empowers PINNs to solve the PDEs across different spatial and temporal scales. The integral operator transformation method facilitates the utilization of PINNs for solving intricate IDEs.
Controlling strata deformation during shield tunneling beneath unconsolidated soil layers poses a significant challenge in engineering construction. Limited research exists on optimizing pre-grouting mechanisms for shield tunnels in unconsolidated soil layers and controlling strata deformation. Therefore, conducting on-site optimization experiments for pre-grouting is crucial for controlling strata deformation. The paper employs crushed stone aggregate as a basis for modifying the shield jacket material. The primary method of verifying grout strength involves direct detection of foundation bearing capacity using a heavy-duty probe inside the tunnel. The feasibility of the comprehensive evaluation scheme is further confirmed through a combination of multi-point core sampling, five-point water pressure tests, and on-site shield monitoring data. The research results indicate that this technology effectively enhances the stability of deep-buried weak strata. By improving the physical and mechanical properties of backfill soil through a combination of crushed stone-cement slurry-soil skeleton, the self-stabilizing ability of surrounding rock is enhanced, and strata deformation is controlled. Additionally, a set of pre-grouting reinforcement and evaluation techniques suitable for deep-buried weak strata is proposed, providing valuable references for similar projects.
Too little support force at the palm surface during shield excavation can lead to destabilization of soil before the excavation face and cause ground subsidence. Construction disturbances during excavation can affect the mechanical properties of the surrounding soil, which cannot be ignored when determining the needed support force at an excavation face. Based on the Mohr - Coulomb yield criterion, the collapse of dense sandy soils before the excavation face of shallowly buried shield tunnels is simulated using PLAXIS 3D to determine the collapse mode. Furthermore, the prismatic body in the traditional 3D wedge model is modified to an inverted elliptical-truncated cone with a certain inclination so that the collapse zone is closer to real sliding soils, and the disturbance ratio r is introduced as an index to consider a construction disturbance. The expression of the active limit support force with respect to wedge inclination is derived, and the maximum support force is determined by trial and error to be the minimum support force needed. The results of the modified 3D curved model are in good agreement with the numerical simulation results, as well as the results of theoretical methods and model tests.