共检索到 2

In order to study the dynamic response of high-speed railway bridge and its deformation law under the coupling effect of vibration load and shield tunneling, a coupling model of shield tunneling and train load is established based on the actual case of tunneling under an adjacent bridge. The deformation characteristics and dynamic response of the bridge are investigated by analyzing the deformation under different tunneling conditions and train running speeds. The results show that the maximum disturbance of the original stress field around the bridge is caused when the shield penetrates to the near side of the bridge structure, at which time, the damping effect of the ground and bridge system on the vibration load is weakened, thus intensifying the dynamic response of the bridge system, and the additional deformation caused by the vibration load is the largest; the presence of train loads during the shield excavation slightly attenuates the differential settlement of the bridge, but increases the cumulative settlement of the bridge, in addition, the additional deformation of the bridge will increase with the increase of the train running speed; the additional deformation caused by the train load within 2m of the shield crossing on both sides of the bridge is large, so the construction should be avoided as much as possible when the train is running in this construction section.

期刊论文 2024-11-15 DOI: 10.1142/S0219455424502407 ISSN: 0219-4554

The increasing demand for high-speed railways has risen, to solve the age-old problem of bridge abutments, the step between the backfill and the bridge deck. Examples prove that inadequate technical solutions can generate damage that may require long-term speed restrictions or lead to short maintenance cycles, significantly increasing the total cost of ownership. The problems associated with the transition zones require complex analysis. The complex interaction of structural elements with different stiffnesses and different dynamic behavior varies over time due to the time-dependent behavior of the soil, and in addition, a bridge deck and its connecting elements can be constructed in several sequences. This study investigated a typical single-span railway bridge and its soil environment using PLAXIS 3D geotechnical finite element software. Different constitutive soil models were used to approximate the behavior of the bridge and the connecting elements. To model the soil behavior, the HS-small constitutive model was implemented. Loads of the structure are transferred onto the subsoil by 60 cm diameter piles modeled as embedded piles. Six different construction schedules were analyzed using time-domain analyses. The importance of high-speed railways was highlighted, and a 250 km/h train speed was applied, using dynamic analysis. The study focuses on the effect of different construction schedules on settlement, consolidation time, the behavior of the transition, and the substructure movements. The results of this study show that geotechnical approaches by themselves are not enough to solve the problem of the transition zone, highlighting the collaboration of geotechnical, structural and railway engineers.

期刊论文 2024-01-01 ISSN: 1785-8860
  • 首页
  • 1
  • 末页
  • 跳转
当前展示1-2条  共2条,1页