共检索到 2

The pile foundation construction adjacent to an operational subway tunnel can induce the creep effects of the surrounding soil of the tunnel, resulting in the deformation of the existing tunnel lining and potentially compromising the safe operation of the tunnel. Therefore, the Mindlin solution and the generalized Kelvin viscoelasticity constitutive model were employed to establish the theoretical calculation model for the deformation of the adjacent subway tunnel caused by the pile construction. Then, the effect of pile construction on the deformation of adjacent tunnels under different pile-tunnel spacing was analyzed via three-dimensional numerical simulation and theoretical calculation methods and compared with the field monitoring data. The results showed that the theoretical and numerical data are in agreement with the field monitoring data. The theoretical model provides closer predictions to the field-measured values than the numerical simulation. As the distance between the pile and the tunnel increases, both the vertical settlement and the horizontal displacement of the subway tunnel lining exhibit a gradual reduction. In the hard plastic clay region of Hefei City (China), pile foundation construction near an operational subway tunnel can be classified into three distinct zones based on proximity to the tunnel: the high-impact zone (3.0 D). The pile foundation in high-, moderate-, and low-impact zones should be monitored for 7 days, 3 days, and 1 day, respectively, to ensure the stable deformation of the lining.

期刊论文 2025-03-21 DOI: 10.3390/buildings15071001

Watery strata and the influence of pore water pressure cannot be ignored when calculating the deformation of existing tunnels induced by the excavation of new undercrossing tunnels. Many parameters can affect the deformation of existing tunnels during the excavation of a new undercrossing tunnel. In this work, an optimized method was developed for calculating the settlement of an existing tunnel undercrossed by a newly excavated tunnel in water-rich strata. This method includes a deterministic calculation model and a probability analysis model. Based on the constitutive behavior of the soil and the poroelasticity theory, the excess pore water pressure at the axis of the existing tunnel was obtained and used in the deterministic calculation model, which computes the deformation of the existing tunnel. In addition, we established a probability model based on Kriging metamodeling, the Latin Hypercube sampling (LHS) and Monte Carlo sampling (MCS) methods, and conducted global sensitivity analysis (GSA) and failure probability analysis. The optimized parameters can be input into the deterministic model to make more accurate predictions. The optimized method was applied in and validated by a metro project in Beijing.

期刊论文 2024-11-01 DOI: 10.1016/j.trgeo.2024.101436 ISSN: 2214-3912
  • 首页
  • 1
  • 末页
  • 跳转
当前展示1-2条  共2条,1页